Manufacturers don’t fail for lack of orders — they fail on costing they can’t trust, schedules that slip and quality that escapes. HYPERSYS runs the plant and the books on one platform, so every work order carries its true cost.

  • Work orders, MRP & scheduling
  • Shop floor, quality & maintenance
  • True product costing, live
100%of work orders costed against standard, live
−35%typical reduction in expedited material buys
FEFObatch and lot traceability, receipt to shipment
1 ledgerplant transactions post straight to Financials
Production schedule · line 2
WO-0847 at 82% complete · quality hold cleared · on track for Friday
The problems we solve

What breaks first on a growing plant floor

01

Costing you can’t defend

Standard costs set once a year and never reconciled mean every quote is a guess. HYPERSYS captures material, labor and overhead per work order and shows variance while the job is still running.

02

Materials arriving late — or early

MRP driven by live demand, BOMs and supplier lead times plans purchases when they’re needed. Supplier collaboration keeps promise dates honest.

03

Quality that escapes

Inspection plans at receiving, in-process and final; quality holds that actually stop shipment; and full batch genealogy when a customer calls.

Your HYPERSYS stack

The turnkey Manufacturing solution

The manufacturing stack pairs the Nexus core with the Manufacturing and Supply Chain Planning add-ons — plant and ledger, one system.

Nexus Manufacturing

Work orders, finite scheduling, MRP, shop floor execution, quality management and equipment maintenance — the add-on that runs the plant.

Nexus Supply Chain Planning

Multi-level BOMs, demand and supply planning, cost management and supplier collaboration — materials planned, not chased.

Nexus Inventory

Raw material, WIP and finished goods by warehouse and bin; batch/lot capture at receipt; GRNs, transfers and cycle counts.

Nexus Procurement

RFQs and blanket agreements for strategic materials, supplier qualification, receiving with quality gates and three-way matching.

Nexus Financials

Work-order costing posts to the GL automatically — WIP, variances, absorption and finished-goods valuation without month-end archaeology.

Nexus Risk & Compliance (GRC)

Controls testing, segregation of duties and audit management for regulated and certification-bound manufacturers.

See the full product catalog

Plan-to-produce

A schedule the floor believes and finance can price

When planning, execution and costing share one database, the schedule stops being fiction. Orders explode through BOMs into material requirements; work orders hit the floor with routings; every completion and scrap entry updates cost and inventory in real time.

  • MRP that respects realityLead times, minimum orders, on-hand and in-transit stock all considered — planned orders you can actually release.
  • Shop floor without paperOperators clock on to operations, report quantities and scrap from a tablet — labor lands on the work order as it happens.
  • Maintenance built inPreventive maintenance schedules and breakdown work orders on the same platform, so downtime shows up in the numbers.
Livework-order cost vs standard, while the job runs
Fullbatch genealogy from supplier lot to customer shipment
1 clickfrom planned order to released purchase order
0reconciliation between plant system and ledger
FAQ

Manufacturing, asked and answered

How clean does our BOM and routing data need to be to start?
Cleaner is faster, but implementation includes structured BOM and routing migration with validation reports — most plants go live on their top-running products first and onboard the long tail in waves.
Can we run make-to-order and make-to-stock side by side?
Yes. Sales orders can drive work orders directly for MTO lines while MRP plans MTS items from forecast and reorder policy — both on the same floor, costed the same way.
Does quality management support certifications like ISO 9001?
Inspection plans, non-conformance records, corrective actions and full traceability provide the operational evidence trail auditors ask for; GRC adds controls testing and audit management on top.

Bring one BOM and last month’s variance report

We’ll show you the same product planned, produced and costed on HYPERSYS — with the variance visible before month-end, not after.